Search Site

This search form uses an instant search feature. As you type, search results will appear automatically below the search field. When you've entered you desired search terms use tab to navigate through the available results and hit enter to open the selected page or document.
Willard Receives Building Improvements
Willard Receives Building Improvements
Jeremy Duncan
Friday, August 30, 2019

The summer of 2019 was a busy one for the custodial and maintenance staff at Willard Elementary School.  Walking into the building, it is obvious that much time and care was taken over the summer to give the building a fresh look.  This is evident the moment you step foot in the front doors, as you are greeted with a new entry rug emblazoned with the Willard logo.  Gone is the old carpet throughout the building, replaced by a new, warm, and modern look.  The egg shell white paint color has been replaced with tones of gray, beige, and navy blue.  Sleek new bulletin boards have replaced mismatched boards throughout the building.  Signage for the new PRIDE initiative can be found throughout the building.  In the gymnasium, new wall pads cover the walls at each end, providing both safety and a new look.

We are so grateful to our Superintendent, Mr. Rolland Abraham, and our wonderful School Board for investing in the aesthetics of our building.  Also, a BIG THANKS to all of those who worked tirelessly this summer to revamp the building and get it ready for students!